Used to transfer floor loads to the support posts pillars and walls below.
Podium slab floor ceiling assembly.
D925 unres nwc z106hy.
Fire resistance directory for the necessary construction details.
It will be a 5 store building with the first floor constructed using metal stud framing steel column and beam structure with a hollow core concrete slab floor ceiling assembly with 4 stories wood framing structure above this podium.
Of a podium building podium slab concrete slab acts as both structural floor and a transfer slab for the wood and or light gauge steel frame construction above it.
Load bearing elements such as walls and columns of superstructure above the podium slab may not align with substructure load bearing elements below.
D925 unres nwc mk6gf.
Here you can find drawings for our ul fire rated floor assemblies and ul fire rated ceiling assemblies.
D925 unres lwc mk6gf.
Floor ceiling assemblies with composite deck.
In multifamily residential structures a concrete podium slab typically acts as both a structural floor and as a transfer slab for wood and light gauge steel framed construction above.
Transfer slab beam constructed out of concrete and steel reinforcements with a slab of concrete.
Refer to the u l.
Concrete thickness is thickness of slab above deck in.
Usually these slabs are situated above parking levels and as such require higher fire ratings and reduced sound transmission.
D925 unres lwc z106hy.
Podium slabs are special type of floor system that transfers loads from a steel or wood frame structure above the slab to walls and columns below.
Our range of drawings can help pros plan projects more effectively by utilizing designs for a fire rated ceiling assembly.
N708 unres all.
Mifab offers a number of podium drain solutions for different types of applications.
The ratings relate to fire tests designed to determine how quickly fire can raise the temperature to unacceptable levels.
Elements of buildings the fire resistance rating classifies the ability of an assembly to confine and isolate fire within a zone comprised of fire resistance rated walls ceiling and floor assemblies.
Unprotected future floor ceiling nwc fluted cellular ul d925.
Contractors have told us that installing floor drains within a podium system is not easy because of the need to properly accommodate the 3 4 drain board that is typically installed underneath the pavers.
D925 unres nwc all.
Deck finish shall be galvanized 2.
Na lwc fluted cellular ul d925.